SUCCESSFUL CONTRACT:
Gas Compressor & Gas Turbine In Thailand

1st Supply Equipment
in Upstream Market

1980

Ingersoll Rand

First supply Reciprocating Gas compressor for UNOCAL, PTT, EGAT

in natural gas drilling and production in the Gulf of Thailand

Ingersoll Rand

First introduce Aero-derivative Gas Turbine/ PTT OCS#1

The success confirmed to Onshore Compression Station #2 in 2001

1984
1986

Dresser-Rand

First supply Gas Compressor package/ Thai Shell – PTTEP S1 in Sirikit Field, Kamphaeng Phet

Rental Fleet with option to purchase

SUPPLY EQUIPMENT
in Oil and Gas Industry

Dresser-Rand

Supply of Gas Turbine Driven Generator for Refinery (RRC)

1995
1997

Dresser-Rand

Supply of Gas Turbine Driven Centrifugal Compressors for Natural Gas Parallel Pipeline Offshore Service/ PTT- ERP

GE Oil & Gas

Gas Turbine driven for the Midline Compressor Station

To boost the gas of Thailand, in the 4th transmission pipeline.

2015

Successful Contract:
Maintenance Services &
Integrated Solution

Provide Inspection and Overhaul Service for “Allision’ Gas Turbine 501KCS.

Onshore Gas Compressor/ PTT OCS#1

1992

Technical Consultant and Management for Modification work

EGAT South Bangkok Power Plant Reciprocating Gas Booster compressors : 1800 HP

1993
-
1994

Installation Reciprocate Gas Compressor

for Thai Shell/ PTTEP S1 in Sirikit Field, Kamphaeng Phet

  • (K3300) 1200 HP
  • (K3750) 1200 HP

Emergency Shutdown

PTTGC OLE#1 (NPC)

Problem : Gas Compressor Lock up
Solution : Corrective Maintenance by coordinating with Dresser Rand Malaysia , USA and Local workshop in Thailand
Completed : Within 22 days ahead of the schedule

1999
2002

Relocation Gas Compressor/ Gas Turbine from Chonburi to Ratchaburi

Engineering and route management for all mechanical equipment & instrument relocation total 521 units including

  • Overhaul for ‘Solar’ Gas Turbine
  • Revamp ‘ Dresser-Rand’ Gas Compressor
  • Installation & Commissioning

Maintenance Contract

Reached an agreement with PTT to maintain Gas Compressor and Turbine at Kanchanaburi.

2015
2020

Repair by Replacement Turbine Mid Frame

at PTT Gas Compression Station, Kanchanaburi

Gas Turbine exchanges

This new Gas Turbine model is designed to increase gas transmission force stability and a longer run length from 20,000 hours to 50,000 hours—the exchange is at the Gas Compression Station, Kanchanaburi.

2021

Committed to Excellence

We keep our promises and take care of our responsibilities to the customer.
All of our employees aim to create the best result possible.